Zurück zum Inhalt

Syrian Heritage Archive Project

  • Themen
  • Bildergalerie
  • Karte
  • Einen Beitrag leisten
  • Aleppo
  • Über uns
  • Englisch
  • Arabisch
Rubble management, showcase proposal drawing for sequence of operation in al-ʿAdiliyya mosque, Aleppo

Rubble management, showcase proposal drawing for sequence of operation in al-ʿAdiliyya mosque, Aleppo

planning scheme suggesting of a sequence of operations for clearing and sorting of the building remains, using the example of the rubble mound from the dome of the al-ʿAdiliyya Mosque in Aleppo. The general procedure, as illustrated in the section above, proposes working from the outside to the inside and from top to bottom

Full size1280 × 957

Abb.34-b_sequence of operations for clearing

    Ort
  • Aleppo, Jamiʿ al-ʿAdiliyya
    إZeitraum
  • 2019
    Art des Motivs
  • Denkmalpflege, Krieg, Monument (historisch), Moschee mit zentraler Kuppel, Restaurierung (Altbau), Schaden
    Stichworte
  • Assessment, Damage, Document, Draft, Drawing, Trümmer, Schutt

EIN PROJEKT VON:

GEFÖRDERT VON:

VERWALTET DURCH:

  • Datenschutzerklärung
  • Impressum
  • Cookie Richtlinien
  • Cookie Richtlinien