Skip to content

Syrian Heritage Archive

  • Aleppo
  • Stories
  • Gallery
  • Map
  • Contribute
  • About Us
  • Arabic
  • German
Rubble management, showcase proposal drawing for sequence of operation in al-ʿAdiliyya mosque, Aleppo

Rubble management, showcase proposal drawing for sequence of operation in al-ʿAdiliyya mosque, Aleppo

planning scheme suggesting of a sequence of operations for clearing and sorting of the building remains, using the example of the rubble mound from the dome of the al-ʿAdiliyya Mosque in Aleppo.
The general procedure, as illustrated in the section above, proposes working from the outside to the inside and from top to bottom

Full size1280 × 957

Fig.34-b_sequence of operations for clearing

    Place
  • Aleppo, Jamiʿ al-ʿAdiliyya
    Time Period
  • 2019
    Type of Subject
  • Central-dome mosque, Damage, Historic preservation, Monument (historic), Restoration (conservation), War
    Keywords
  • Assessment, Damage, Debris, Document, Draft, Drawing, Rubble
    Place hierarchy
    Author
  • Issam Ballouz; Unknown origin base plan
    Copyright
  • 2019, some rights (CC-BY-NC-SA) reserved to Museum for Islamic Art, Berlin
    EasyDB ID

A PROJECT OF:

FUNDED BY:

MANAGED BY:

  • Privacy and Data Policy
  • Imprint
  • Cookie policy